Client: Akkeron Group
Value: £1,360,000

Our works included:

– Cut & fill (bulk earthworks)
– Forming a working platform utilising old leisure centre demolition material
– Specialist impermeable membrane
– Gas venting mats and vents
– HB kerbs to boundaries and BN kerbs to parking bays
– Type 1 subbase and tarmac surfacing to the thoroughfares
– Type 3 subbase and CellPave 50 grids infilled with gravel to car park bays
– Type 3 subbase and gravel finish to toleration area
– Existing cycle path alterations
– Services and drainage (headwall, ACO channels, pipework, manholes and cesspool tank works)
– Barriers and white lining
– Landscaping