Client: Pearce Construction
Value: £825,000

We recently completed the groundworks package for a new industrial units and car parking development in Barnstaple.

Our scope of works included:

– Site preparation, including reduced level excavations and engineered fill
– Building substructure, including holding down bolts for the steel frame and an RC40 power-floated concrete floor slab
– Cherry picker margin
– Below-ground drainage, including manholes, inspection chambers and ACO drainage channels
– Attenuation tank installation
– Below-ground services
– RC40 brushed-finish concrete access road
– Tarmac car parking area
– Block paved footpaths
– Kerbs and edgings
– Gravel margins
– Landscaping