Our works included:
– Site preparation
– Cut and fill (bulk earthworks)
Building
– Pad foundations
– Installation of holding down bolts
– Cherry picker margin
– Terram
– Type 1 803 subbase filling
– Perimeter shutter
– DPM & Insulation
– A252 mesh reinforcement
– Construction / movement joints
– RC40 concrete slab
Yard
– Surface & foul water below ground drainage (manholes, inspection chambers, gullies, ACO Qmax & channel, pipework, bypass separator)
– Attenuation tank
– Attenuation pond & headwalls
– Below ground services incl. substation base
– Terram
– Capping material filling
– Type 1 803 subbase filling
– Forming new crossover / entrance
– Tarmac access road
– A252 mesh reinforcement
– Construction / movement joints
– RC40 concrete brushed finish slab
– Tarmac parking area
– Block paving
– Kerbs / edgings
– Gravel margin
– Blockwork retaining wall
– Bollards & bike hoops
– Landscaping