Client: Shebbear College
Value: £40,000.00
Substructure Works comprising the excavation and concrete to foundations. Trench blocks and blockwork to DPC. Mesh reinforced ground bearing slab on sub base bed. Foul and surface water drainage. Service ducts to plant room.