Client: Torridge District Council
Value: £21,000
The proposed scope of works for this project was to extend the existing concrete surface which will be anchored below the sand and into the clay level of the beach. This was then followed by positioning of rock armour (large boulders) to aid in protecting the slipway from future weathering. – Photos by courtesy of Chris Wilson, TDC.