Client: 3 Rivers Developments Ltd
Value: £1,300,000
Groundworks for 9 new build eco-friendly houses at Bampton, Tiverton
Our works included:
– Bulk earthworks (topsoil strip and reduced dig)
– Reinforced concrete retaining wall (155m long x up to 3.30m high)
– Gabion basket retaining walls
– Plot foundations
– Ground floor works (block and beam)
– Kerbs and edgers to new road, footpaths and driveways
– Tarmac and Breedon gravel surfacing for new road / access
– Tarmac and block paving footpaths and driveways
– On-site below ground drainage including attenuation tanks
– Off-site below ground drainage including directional drilling
– On-site underground services
– Landscaping works for gardens, verges and earth banks