Client: Interserve Construction Limited
Value: £140,000.00
Creating a site access, a temporary reinforced concrete crossover in the footpath. Geogrid and terram stoned access road with passing places. Goal posts to overhead cables, 450mm diameter ductile pipework for ditch / culvert crossings including removal of all temporary works and reinstatement upon completion. Excavation of reed beds, ducted services trenches, ductile iron pipework and fittings. Plastic pipework, valves and valve boxes. Interstage pump station, settlement tanks, reinforced concrete equipment slabs, Precast concrete manholes and hard standings / footpaths.